YTC managing director Rimas Kairaitis told the Mining 2013
Resources Convention in Brisbane last week that the rig was
already on site and the drilling was anticipated to take 10 days
to hit the modelled conductor.
The article was on 23 October.
This suggests that drilling to the target is hit, or will be hit very soon.
Expect about another 2 weeks for assays?
Interesting times ahead.