MDX 0.00% 3.7¢ mindax limited

yilgarn unlocked

  1. 6,575 Posts.
    lightbulb Created with Sketch. 123
    New article on the Esperance Port upgrade available on the Mindax website.

    http://mindax.com.au/upload/documents/InvestorRelations/Media/20121212_YilgarnUnlocked.pdf

    Modest Esperance Port upgrade
    DSO Stage one – additional 10–15 Mtpa = total 26 Mtpa
    • Learning the lessons of Oakajee – no gold plating
    • Cap cost approximately $225 million – tariff structure
    economically viable for miners
    • No seabed reclamation (no two- to three-year additional
    environmental approval process required)
    • Two-year construction horizon possible once proponent
    selected to upgrade stage one infrastructure
    • New twin-cell RCD (rail car dumper)
    • Negative pressure sheds (750,000 tonnes)
    • New rail and conveyer systems
    • Upgrade ship loader from 2400 to ~5500 tph (tonne per
    hour).
    The SCS report


    Mindax also gets a favourable writeup as do several other Yilgarn companies.
 
watchlist Created with Sketch. Add MDX (ASX) to my watchlist
(20min delay)
Last
3.7¢
Change
0.000(0.00%)
Mkt cap ! $96.29M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
2 100000 2.0¢
 

Sellers (Offers)

Price($) Vol. No.
4.0¢ 125000 2
View Market Depth
Last trade - 16.12pm 06/11/2024 (20 minute delay) ?
MDX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.