Obviously hole conditions were good enough, they thought, to run a open-hole DST .. BUT obviously not. Quick and dirty didn't work, now back to testing properly.
I originally thought this well would test reservoir quality for future horizontal drilling .. whether that included flowrate testing, I wasn't sure.
But still sounds good to me although target zones might be lower than estimated.
Bg.