Agree DB, coiled tubing unit would be the way to go imo. It worked a treat at Beharra. And I don't see how they can ever test SB Nullara by conventional drilling, not now they've filled it with LCM around the existing well bore.
ARQ Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held