ARQ 0.00% 8.7¢ arq group limited

ARC Energy advises that as of 0600 on the 26th March, operations...

  1. 495 Posts.
    ARC Energy advises that as of 0600 on the 26th March, operations at the Yulleroo 2 well were
    preparing to carry out drill stem test (DST) 1 over the primary objective Tournasian gas sands.
    Since the last report the well has been drilled ahead to the current total depth of 2935 metres
    measured depth.
 
watchlist Created with Sketch. Add ARQ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.