ARC Energy advises that as of 0600 on the 26th March, operations at the Yulleroo 2 well were
preparing to carry out drill stem test (DST) 1 over the primary objective Tournasian gas sands.
Since the last report the well has been drilled ahead to the current total depth of 2935 metres
measured depth.