ARQ 0.00% 8.7¢ arq group limited

y2 report

  1. 15,604 Posts.
    lightbulb Created with Sketch. 45
    Page 2
    YULLEROO 2 DRILLING REPORT
    CANNING BASIN, WESTERN AUSTRALIA
    Date: 13th March 2008
    Permit: EP 391
    Well Location:
    Lat : 17o 51’ 36.329”S
    Long : 122o 55’ 59.288”E
    Proposed TD: Depth : 3500mMD; (Vertical Well)
    Elevation:
    Ground Level is 57.2mAMSL
    Rotary Table is 62.9mAMSL
    Spud Date: 17:00 hrs, WST 22nd January 2008
    Present Depth at 0600 hrs: 2605m MD
    Time of Reporting: 0600 hrs, WST 13th March 2008
    Operations Since Last
    Report:
    Drilled 216mm (8 ½”) hole from 2359m (244mm casing shoe) to
    2605mMD. POOH to change bit and BHA
    Current Operations: Pressure testing BOPs and surface equipment prior to RIH with
    new bit to resume drilling
    Hydrocarbon indications: None
    Comments: The primary objective is expected to be encountered below
    2900 meters MD
    Participants in the Permit ARC Energy Limited 100% (Operator)
 
watchlist Created with Sketch. Add ARQ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.