AXT 0.00% 1.4¢ argo exploration limited

As stated in the previous report, rig onsite 09 May 11!!...

  1. 326 Posts.
    As stated in the previous report, rig onsite 09 May 11!! TODAY!

    Depending on the type of rig, drilling could be underway tomorrow. 1-2 days setting up normally.

    It doesn't take long to set up, fold out a few stabilisers, confirm with GPS co-ords, set up camp, ready the drilling equipment, grab a slab and put it on ice.

    Wouldn't be surprised if the earth is turned tomorrow or Wednesday at the latest. I dare say Hugh would get a phone call this arvo saying we are all ready or just waiting for some final equipment, will be drilling .... May 11.

    We will be drilling this week imo.
 
watchlist Created with Sketch. Add AXT (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.