DOW 0.88% $5.76 downer edi limited

Wow - a mega disaster in the making, page-69

  1. 5,085 Posts.
    lightbulb Created with Sketch. 146
    hmm, I wasnt thinking about the cyclical nature of construction as opposed to maintenance, which is probably the bigger picture behind the takeover, maintenance and services are more reliable.

    A lot of the big contracts (like PPP's) do both, so the cyclical nature of construction will be tempered by the long tail of a maintaining and servicing their construction projects.
    The difficulty will be what will happen to all the other work spotless does, what will Downer's plan be for that. Perhaps the Spotless attributed revenue will shrink even fast post acquisition and therefore be worth even less than it currently is. But perhaps they are gambling that its worth a premium for them to escape the cyclical nature of construction.
    Last edited by bug1: 25/03/17
 
watchlist Created with Sketch. Add DOW (ASX) to my watchlist
(20min delay)
Last
$5.76
Change
0.050(0.88%)
Mkt cap ! $3.626B
Open High Low Value Volume
$5.75 $5.81 $5.69 $4.241M 737.5K

Buyers (Bids)

No. Vol. Price($)
2 11134 $5.73
 

Sellers (Offers)

Price($) Vol. No.
$5.76 9983 4
View Market Depth
Last trade - 16.10pm 07/11/2024 (20 minute delay) ?
DOW (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.