MOG 0.00% 0.5¢ moby oil & gas ltd

ASX AnnouncementWednesday, 11 November 2009DUAL FEED CONTRACTS...

  1. 2,648 Posts.
    ASX Announcement
    Wednesday, 11 November 2009
    DUAL FEED CONTRACTS FOR PLUTO EXPANSION
    Woodside advises that it has awarded dual contracts for Pluto Train 2 and Train 3 front-end engineering
    design (FEED) to Foster Wheeler and WorleyParsons (an unincorporated joint venture PJV) and KBR.
    The total Woodside costs, including the dual contracts, for the FEED phase remain within the A$100-150
    million guidance provided at the half-year briefing.
    Woodside chose to award dual FEED contracts to provide the necessary due diligence for the
    engineering, procurement and construction management phase of Pluto Train 2 and Train 3 in the
    fastest time frame.
    Foster Wheeler and WorleyParsons (an unincorporated joint venture PJV) and KBR are expected to
    complete the FEED studies in the second half of 2010.
    Contacts:
    MEDIA
    Roger Martin
    W: +61 8 9348 4591
    M: +61 413 018 674
    E: [email protected]
    INVESTORS
    Mike Lynn
    W: +61 8 9348 4283
    M: +61 439 691 592
    E: [email protected]
 
watchlist Created with Sketch. Add MOG (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.