The nopsema drill plan is out.
http://www.nopsema.gov.au/assets/epsummaries/EP-Summary-Winchester-1-WA-323-P-Drilling.pdf
Drilling will commence in early April and is expected to take approximately 80 days. Well
evaluation, including vertical seismic profiling (VSP) and wireline logging will be undertaken, prior
to the well being plugged and abandoned.
Giddy-up