Farmer Fred - thanks for that post. I expected them to have to stop drilling in that area. The Cooper Basin will probably be cut off soon as well. Just wondering how they make up for this on the roundabout? Do they have extra work stemming from the flooding - I wouldn't think the extent of flooding could have been factored in. Could there be drilling work dewatering in the Bowen valley for example?
I wish I understood.
MB
TSE Price at posting:
$3.26 Sentiment: ST Sell Disclosure: Held