early March would be about right if no more cyclones come through the area. They will be drilling riserless (all returns to seabed) for a week or so and then run riser, BOP's etc and test all the pressure lines etc etc etc. Then they will have a circulating system and drill the lower portion of the well - and then the action really begins.