NML 4.76% 10.0¢ navarre minerals limited

Which one would you keep?, page-30

  1. 547 Posts.
    lightbulb Created with Sketch. 60
    A lot needs to happen for CYL start a mine in 2019. Land acquisition (which will involve VCAT & High Court, these two things are a long drawn out process and will be a battle given the locality). Feasibility & Enviro impact studies, mining application, infrastructure design & build, some where to process the ore (either a pre-existing mill or new one, new ones take a year or two to design, plan & build). Just the infrastructure for a greenfield project can take two years to be built and erected on site to a standard that allows a mine site to function from.

    At the moment CYL have.. some drill results.
 
watchlist Created with Sketch. Add NML (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.