TD = ~3800m from rig platform, Minus water depth of ~ 400m = ~3400m of drilling = approx 21 days of drilling. The first 1000m will take 3-4days, but will get slower as the drill bit get lower into earths crust, will also be 3 casings down to 12".
MOG Price at posting:
17.5¢ Sentiment: Buy Disclosure: Held