rf and ym--if the the 9.5km contains 92.5 mt of resource,we can extrapolate that the 12km contains 116.8mt--the results are also from a drilling depth of 105m--the depth of the resource looks like it could go to 150m depth, and therefore we can again project a resource of 166.85mt--"infill drilling will dramatically extend the orebody and in doing so,increase the tonnage and upgrade the JORC classification"--cheers