seems drill is going as planned. They'll analyse bed 13 whilst drill continues down to bed 18 which is the more substantial deposit/target. Would be a nice bonus if bed 13 turns-out larger/richer than originally anticipated. Not sure how much time required to reach bed 18 but drillbit seems to slice through bedrock comfortably. Here's hoping it matches/dare i say exceeds the company forecast.