How true it is who knows (except perhaps CCE, WAGovt and possibly ARENA).
The quote was taken from the West.
"The project will initially operate at 1MW and is set to open in late 2019"....
https://thewest.com.au/business/ren...-step-towards-global-energy-hub-ng-b88652771z
which contradicts this
"The Albany Wave Energy Project will involve the design, manufacture and install of a CETO 6 unit in Carnegie’s existing licence area offshore from Torbay and Sandpatch in Albany during the 2019/2020 summer weather window"
https://s3-ap-southeast-2.amazonaws...6-Albany-grant-announcement-final-version.pdf
Perhaps the West is talking about the Wave Energy Research Centre opening (which would make sense) rather than installation of the Ceto 6 unit/s (in 19/20 summer window).
The sooner the better I say!! Once a ceto6 is photographed in a fabrication yard/ on a dock/ or being installed the SP will skyrocket as it did with ceto 5. Hopefully Cornwall or Mauritius will follow thereafter (Mauritius I suspect will be a microgrid running battery and solar that will have wave added later).
Good time to buy if you can hold out till 2020.
- Forums
- ASX - By Stock
- What needs to be done?
How true it is who knows (except perhaps CCE, WAGovt and...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCE (ASX) to my watchlist