That PFS was for Kolosori and they tacked on 5 year production from SJ to buff the NPV.
Problem was Axiom hadn't even drilled at SJ when the PFS was published. So how can you add production from a tenement that is in such an early stage? Answer is you can't. Hence the PFS was retracted. The reason given for the retraction was only half the truth.
And by weird coincidence the next announcement from AVQ after the retraction was commencement of a drill program at SJ
In either case the NPV was for Kolosori and not for SJ
Show me a PFS for only SJ or stop wasting people's time by twisting everything to suit your agenda