Questions really need to be asked how they can get a ML without
1) a Jorc showing proven and probable
2) showing the tenement is economical (a feasibility study)
3) proving they can get funding (funded offtake or something)
SJ is in a very early phase, only had a few drill results. And those drill results were very poor.
It is possible the SIG does not care about SJ perhaps just wanted to get RM off their back.
"Financing for life of mine construction and development is in the advanced stages and due to be finalised over the coming weeks. "
It's been nearly two weeks so should be funding news this week or next week. If SJ is worth billions as people here claim then should be no problem. Otherwise people really need to question the motive of the SIG to grant a ML and why RM keeps promising and under-delivering
AVQ Price at posting:
10.5¢ Sentiment: Sell Disclosure: Not Held