Pretty sure guys stage 1 infrastructure port and rail was built to carry the stage 2 mill capacity 16Mta
Oakagee was for anything beyond that
not sure if they are even shipping half that at the moment
GBG Price at posting:
2.1¢ Sentiment: Hold Disclosure: Held