Going forward the company will run a PCP downhole pump and put the well into trial production.
This is expected to happen within the next 2-3 weeks. Based on the results of the trial production a forward plan will be made which could include appraisal/development drilling, in-well-bore radial drilling or fraccing.
Until the pumps installed MoneyWise,I dont think they'll have anything to report IMHO.
Raider
CIG Price at posting:
8.0¢ Sentiment: None Disclosure: Held