Please help if you can set me straight on what I see as a huge "Whitewash" !!
I encourage followers to look at the full chart of assays and see that either side of the very narrow high lighted meters of high grade are 10s of meters of basically dead ground!! If this is meant to shaping up as an open pit project that means they would need at least 600ppm of Moly or Moly/Copper equivalent. From my look I have to go DOWN to 289 metres to even see a width of 19metres at only 542ppm. What pays for the road base material off the top. I repeat down to 289m! It is easy to spin out great announcements showing great photos and exclaiming a marvellous ONE! metre at many thousands of ppm. Who cares when it hundreds of metres down. On there full display of grades have a look how far apart the yellow sections are and that is even with a 150ppm cutoff. I am mystified, like to see it from other angles if I am incorrect. Thanks
AQR Price at posting:
43.5¢ Sentiment: None Disclosure: Not Held