We have the existing (SWIS) network, then ENB 160mw off peak baseload plus possible upgrade, AVA 400 mw baseload plus possible upgrade, 90 mw walkaway wind farm, i'm not sure what amount of power the midwest will need but you would think that this would be a good start, plus the possibility that any large developments may produce their own power and sell back into the swis network, maybe i'm wrong, my thoughts only.
nomadd...