I rang the company today to seek some info on when Lake Frome SA will be drilled, the MD advised that they are having trouble securing a suitable qualified drilling contractor/rig. The MD stated drilling will is probably abt 4 months away for that lease area, However he did state that they will be drilling in the NT next month and should have Jorc resource cal for WA Yanrey project within 6-8 weeks