VANESSA-1: PEL-182 COOPER BASIN S.A.
Eagle Bay Resources advises that three drill stem tests have been run across the
Epsilon and Toolachee Formations with the following results:
DST #1A Epsilon Fm 29-7 Sand Test Interval 2977.1m 2980m:
Flowing Pressure 800 PSI on ½" Choke. Estimated Final Rate - Gas at 4.4 MMscfd
Gas Composition: C1/C2/C3/C4/C5 86/11/2/1/tr Some CO2
DST #1B Epsilon Fm 29-6 Sand Test Interval 2960.2m 2693m:
No flow after 15 min. Suspected tool malfunction.
DST #1C Toolachee Fm 29-25 Sand Test Interval 2929.0m 2931.8m:
Flowing Pressure 525 PSI on ½" choke Estimated Final Rate - Gas at 2.8 MMscfd
Gas Composition: C1/C2/C3/C4/C5 77/16/5/2/tr Some CO2. Logged sand
thickness + 10 meters.
Based on these results, production casing will be run and the well suspended pending
completion as a possible gas producer at a later date.
Current operations are attempting to pull out of the hole with the test tools.
- Forums
- ASX - By Stock
- EBR
- we have gas people
we have gas people, page-2
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EBR (ASX) to my watchlist
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online