Regarding F3, they have 2 of the 3 pieces recovered. This is the service tool, gravel packer.
The last piece of the puzzle is getting the wash pipe out am I right? Before that they will wash over the remaining completion tool equipment then pull out the wash pipe.
Once the wash pipe is out, what needs to occur before F3 starts pouring out that beautiful black gold?
Cheers,
ibis.
BYE Price at posting:
38.0¢ Sentiment: Buy Disclosure: Held