Stu1964 WKT are working towards some drilling and flyover in...

  1. 2,253 Posts.
    lightbulb Created with Sketch. 937
    Stu1964 WKT are working towards some drilling and flyover in January.Historically they do things in parallel and are known to be very conservative when reporting....Already 1 of the pegmatites is measured at 1.8 km long and hopeful that a thin veneer cover exists between pegmatites along 27 km of strike...Another adjoining licence in the final stages of discussion where it is believed the river of lithium flows into...

    This is a diversified company with High grade graphite rated best in class from surface...2018 could be a stand out year for WKT but hopeful of additional material news re graphite shortly...

    Croc
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.