within the red line of the first map i get about 3.0 km2the main seam is 7 m thick ( at sarji east )sg = 2so 3.0 million x 7 x 2 = 40 million tonnesdyor as i have no idea
Week 46 Wrap: Copper hits 2mth low as Trump threatens net zero pace; US rally fades; HotCopper’s picks
AN1 CuFe sells its Crossroads gold royalty to Northern Star for $4M cash; says better than waiting for mine launch