500 bopd @ $10m operating profit means we've enough for our share for KN#2 & another well in the Nyuni block for drilling late 2010/early 2011. Probably not quite enough for WSS so perhaps a raising or farmin partner for WSS in 2011.
Any less will mean that some level of raising would be needed or a miracle happens and KN#1 starts production in the next month or two.