500 bopd @ $10m operating profit means we've enough for our share for KN#2 & another well in the Nyuni block for drilling late 2010/early 2011. Probably not quite enough for WSS so perhaps a raising or farmin partner for WSS in 2011.
Any less will mean that some level of raising would be needed or a miracle happens and KN#1 starts production in the next month or two.
- Forums
- ASX - By Stock
- KEY
- wag time
wag time, page-25
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KEY (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.262M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KEY (ASX) Chart |
Day chart unavailable