100km to the fresh water bore field, thats a long drive when one of the pumps stops working, but then everything about lake mackay is a long drive.
this will require a local power source as it is too far from the plant to use the main power supply i'm guessing.
100km of large diameter water pipe can't be cheap.
big project, big challenges, big rewards (???).
- Forums
- ASX - By Stock
- AMN
- WA EPA submission
WA EPA submission, page-2
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AMN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.5¢ |
Change
0.010(7.41%) |
Mkt cap ! $60.70M |
Open | High | Low | Value | Volume |
13.5¢ | 14.5¢ | 13.5¢ | $4.941K | 35.18K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 30000 | 14.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 74741 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5555 | 0.180 |
1 | 30979 | 0.175 |
5 | 69411 | 0.170 |
2 | 106061 | 0.165 |
2 | 18611 | 0.160 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 10525 | 1 |
0.195 | 28699 | 1 |
0.200 | 10206 | 2 |
0.205 | 15888 | 2 |
0.210 | 8238 | 1 |
Last trade - 13.05pm 26/11/2024 (20 minute delay) ? |
AMN (ASX) Chart |