http://www.karpowership.com/en/home?v=basic
May be an option to bridge the gap between shutting coal plants and having enough batteries available for business as usual.
Tick quite a few boxes.
High efficiency, high turndown ratio Combined cycle gas or LNG fuel options
Readily available within 3-4 months for duration of 1-3 years
No capex required, pay as you go and when finished it sails away.
Up to 450MW
with capability full suite of ancillary services needed to run grid- black start, frequency and voltage control etc, plus desalinated water.
- Forums
- Commodities
- WA Coal Power Stations to Close Down
WA Coal Power Stations to Close Down, page-21
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)