WA Coal Power Stations to Close Down, page-21

  1. 869 Posts.
    lightbulb Created with Sketch. 29
    http://www.karpowership.com/en/home?v=basic

    May be an option to bridge the gap between shutting coal plants and having enough batteries available for business as usual.

    Tick quite a few boxes.

    High efficiency, high turndown ratio Combined cycle gas or LNG fuel options
    Readily available within 3-4 months for duration of 1-3 years
    No capex required, pay as you go and when finished it sails away.
    Up to 450MW
    with capability full suite of ancillary services needed to run grid- black start, frequency and voltage control etc, plus desalinated water.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.