VTI 0.00% 12.0¢ visioneering technologies inc.

vti news, page-4

  1. 1,543 Posts.
    lightbulb Created with Sketch. 75
    CJT, depends on how you look at it. It could mean that the Bauxsol has put a stop to the deteriorating situation. In other words, since the Bauxsol application. the contamination level has not increased but rather stabilised. It would probably take a bit longer for it to get better because there are bound to be some contaminated water still flowing into the well that has long travelled past the Bauxsol area before its application. Also, it would surely need some time for the Bauxsol to completely 'wrap' up those pyritic soil/rock.

    Cheers.
 
watchlist Created with Sketch. Add VTI (ASX) to my watchlist
(20min delay)
Last
12.0¢
Change
0.000(0.00%)
Mkt cap ! $5.503M
Open High Low Value Volume
12.0¢ 12.0¢ 12.0¢ $1.122K 9.349K

Buyers (Bids)

No. Vol. Price($)
4 46011 12.0¢
 

Sellers (Offers)

Price($) Vol. No.
14.0¢ 8477 1
View Market Depth
Last trade - 12.45pm 29/11/2024 (20 minute delay) ?
VTI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.