Oropa announced a very detailed quarterly, here are some very significant key points made:
INDONESIA GOLD
Revised resource estimate for Sihayo 1 North nearing completion and to be released in May, 2008
Mining scoping study for Sihayo 1 North and Sambung planned for mid-May, 2008
Massive silica–breccia-quartz veining intersected over 71m interval in deeper drilling at Sarahan
vein, Hutabargot Julu will require follow up drilling.
*In addition to the resource estimate, a review will be conducted into determining the drill density required
for a drill-out of the two resources, which will enable a costing and timetable to be generated to advance the
project to Bankable-Feasibility Study.
*Based on work undertaken to date, the Sarahan vein is the most substantial vein within the prospect area,
interpreted to be over 3 km in length, with exposures in outcrop and historic Dutch exploration adits 5-10
metres wide. Significant gold grades have been returned from many rock and channel chip samples. These
factors contribute towards Sarahan being regarded as the primary target for deep high-grade gold.
MALAWI URANIUM & BASE METALS
Positive results have been obtained from geochemical exploration surveys conducted towards the
end of 2007 at the Mzimba Northwest and Chitunde Project areas in Malawi. Detailed results to
be announced in early May
*Additionally, Globe Uranium Ltd
(“Globe”) has recently completed a highly successful scoping study of its Kanyika multi element uraniumniobium-
tantalum-zirconium deposit in central Malawi, where Oropa holds an Exclusive Prospecting
Licence (“EPL”) adjacent to Globe’s Kanyika EPL.
*OEPL(OROPA) now has an office and transit base in Lilongwe
and has stocked necessary field supplies for exploration campaigns this field season. The Company is
presently recruiting a competent geologist to establish an operational base in Malawi and oversee
operational activities during the current field season.
*Encouraging results from limited exploration programs conducted throughout the country to date
exhibit the potential of Malawi and the Company expects that its forthcoming programs in 2008 will be
rewarding.
COAL INDONESIA
During the quarter, the Company aggressively pursued a number of coal projects in Kalimantan, and more
recently in Sumatra, Indonesia in its quest to source a bona fide coal project in Indonesia (geographically
compatible with Pungkut). Indonesia has become a substantial global producer of coal and Oropa is
utilising its inherent knowledge to source and hopefully acquire an advanced coal project that could be
rapidly developed to production, principally to fund the development of the Pungkut gold project.
- Forums
- ASX - By Stock
- ORP
- very significant points from quarterly
very significant points from quarterly
Featured News
Add ORP (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.44M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 152915 | 3.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.2¢ | 3334 | 1 |
Last trade - 16.12pm 03/12/2024 (20 minute delay) ? |
Featured News
ORP (ASX) Chart |
Day chart unavailable