AEE 3.23% 15.0¢ aura energy limited

While we wait, a few points to remember about the Vanadium...

  1. 4,312 Posts.
    lightbulb Created with Sketch. 144
    While we wait, a few points to remember about the Vanadium resource.

    ▪ Aura is now targeting a modest size 2-3mtpa project to produce approximately 5% of current vanadium supply

    ▪ The High-Grade Vanadium zone is very shallow making this very achievable

    Key activities;

    ▪ Beneficiation test work to increase feed grade – target 1% V2O5

    ▪ Capital and operating estimates for vanadium processing plant

    ▪ Update Häggån 2012 Scoping Study by Sept 2018

    Aura is very advanced on the Häggån deposit as vanadium was studied in the 2012 Scoping Study but not utilised

    ▪ Häggån deposit is well drilled with significant metallurgical test work

    ▪ Only supplementary metallurgical test work required to fill in particular gaps

    ▪ Targeting completion of above work pre Vanadis IPO in Q3/4 2018
 
watchlist Created with Sketch. Add AEE (ASX) to my watchlist
(20min delay)
Last
15.0¢
Change
-0.005(3.23%)
Mkt cap ! $107.4M
Open High Low Value Volume
15.5¢ 16.0¢ 15.0¢ $88.19K 566.7K

Buyers (Bids)

No. Vol. Price($)
5 261130 15.0¢
 

Sellers (Offers)

Price($) Vol. No.
16.0¢ 434272 9
View Market Depth
Last trade - 15.59pm 02/12/2024 (20 minute delay) ?
AEE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.