TAS 0.00% 0.5¢ tasman resources ltd

value, page-45

  1. 2,344 Posts.
    lightbulb Created with Sketch. 379
    Hi t2,

    totally agree that labour is the big driver, I never implied anything else. In fact the cost of labour is the major factor in my whole calculation i.e. by using less concrete the pour is over more quickly, by using less steel the preparation time is reduced and due to the longevity of the concrete there will be less repairs along the way and not as many total relays (roads/highways/bridges etc.). This is why EdenCrete is a no brainer.

    Cheers!
 
watchlist Created with Sketch. Add TAS (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $4.026M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 221958 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 4785706 4
View Market Depth
Last trade - 16.12pm 18/11/2024 (20 minute delay) ?
TAS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.