TAS 0.00% 0.5¢ tasman resources ltd

value, page-44

  1. t2
    738 Posts.
    I'm not sure I fully agree MB49.
    Labour is the big driver in construction now. Not materials. If workers don't need to place and tie steel, rather order concrete with EDE magic dust in it, the actual pour costs are the same, so difference overall is cost to supply and place steel vs cost of magic dust additive. This surely would amount to a major saving unless the raw cost of the dust is over the top.
    Last edited by t2: 22/04/16
 
watchlist Created with Sketch. Add TAS (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $4.026M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 221958 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 4785706 4
View Market Depth
Last trade - 16.12pm 18/11/2024 (20 minute delay) ?
TAS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.