XTE 1.77% 57.5¢ xtek limited.

Value of Land 129 Ph4

  1. 26 Posts.
    lightbulb Created with Sketch. 3
    JP 129 phase 4 is set out on pages 78 and 79 of the 2012 Defence Capability Plan. http://www.defence.gov.au/Publications/Docs/capabilityplan2012.pdf
    The estimated acquisition cost in that document was $100-$300m.
    The project later changed its name to Land 129 Ph4. Tenders were called for.
    Xtek was the preferred tenderer. The successful tenderer for acquisition is expected to be announced shortly. The contract will be for Land 129 phase 4 a only. Phase 4 b will follow sometime later.
 
watchlist Created with Sketch. Add XTE (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.