Proposed TD: Depth : 3500mMD; 0 metres offset Elevation: Ground Level is 110.03mAMSL Rotary Table is 115.73 mAMSL Spud Date: 1900 hrs, WST 15 November 2007 Present Depth at 0600 hrs: 3466mMD Time of Reporting: 0600 hrs, WST 20 December 2007 Operations Since Last Report: Continued drilling from 2405m through the clastics and carbonates of the Fairfield Group to current depth of 3466mMD in the Carbonates of the Fammenian (Nullara Equiv). During a flow check, the drill pipe became stuck and while attempting to free the pipe and regain circulation, the drill string parted some 300m above the bit. Operations are underway to retrieve the fish. Current Operations: Fishing operations. Hydrocarbon indications: Elevated gas levels above background have continued whilst drilling interbedded limestones, claystones and sandstones of the Fairfield Group. The significance of these and earlier oil and gas indications will be determined once planned wireline logging and proposed Drill Stem Testing has been completed. Comment: The presence of oil shows and the continuing presence of gas shows in the well are encouraging. Drill stem testing of shows is now planned and test intervals will be firmed up following the completion of log analysis.
ARQ Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held