And the dreadful “uncertainty” about the willingness of governments to continue fleecing power consumers and taxpayers – in order to keep throwing massive subsidies at the greatest rort of all time (which, on the wind industry’s pitch will be needed until kingdom come) – has resulted in the collapse of more than 120 wind industry suppliers in the past two years, “including 88 from Asia, 23 from Europe and 18 from North America” (see our post here).
In Germany – despite the fact the the wind industry there has pocketed the lion’s share of at “least half a trillion € in subsidies” – German investors are taking a flogging: “37 percent of wind farms are losing investors’ money” and “two thirds are in deficit or just about cover their running costs” (see our post here).
Around the world, wind farm investors are being fleeced by the same types of hucksters and weasels that run outfits like near-bankrupt Infigen (aka Babcock and Brown); and the smarmy gits that set up so-called “community wind farms” – praying on greed and gullibility in their efforts to pocket $billions in REC Tax/Subsidies.
The scam is the same the world over: pitch numbers that show returns that are too good to be true (they are) and watch the suckers beat a path to your door: greed trumps common sense often enough.
As PT Barnum said: “every crowd has a silver lining” – an adage put to great effect by wholesale fraudsters like Bernie Madoff in scams often tagged “Ponzi” schemes; named after Charles Ponzi – who would have taken to the wind industry like a duck to water.
Madoff – who ended up with a 150 year stretch in stir for his share-market shenanigans – would, no doubt, be pleased to know that the wind industry has followed his “model” and is keeping the Ponzi “dream” alive.
Wind power outfits routinely base their expected returns on pumped up wind forecasts – thereby way overstating their anticipated gross returns (see our posts here and here and here and here).
While, at the same time, lying about their true operating costs (see our post here), which start to tack up pretty quickly when it’s revealed that turbines last less than half the time claimed: with an ‘economic’ lifespan of 10-12 years, as opposed to the 25 years wildly claimed by fan makers (see our posts here and here).
Or, in the case of top-flight German manufacturer, Siemens – less than 2 years – one of it’s latest batches required wholesale blade and bearing replacement, starting almost as soon as they cranked them into gear (seeour post here) – Siemens blaming “harsh weather conditions both onshore and offshore” – as if its fans had been designed to run inside aircraft hangars ….
Like all inevitable financial collapses, the dread-disease is spreading fast: a bunch of Minnesota farmers have just lost their shirts – having thrown their hard-earned at a pair of wind power outfits that have just hit the wall; and gone completely ‘belly-up’ on the prairie.
Owners of two Minnesota wind farms file for bankruptcy court protection
Star Tribune
David Shaffer
7 January 2015