    Thanks Mega.

    Head for Kidston is min 181 metres max 218 metres. On the plus side, the water path between upper and lower reservoirs is very short. Energy storage is 2 GWh (250 MW generation for 8 hours).

    The original concept was for a separate Turkey's Next upper reservoir, but changed to using Wises Pit, but on the basis of the plan shown here it looks very much like a Turkeys Nest reservoir which happens to have Wises Pit in the middle of it.
 