ADI 2.35% $3.05 apn industria reit

updates?, page-34

  1. 7,782 Posts.
    lightbulb Created with Sketch. 86
    this from adelphi and the jvp on 1st feb 2010

    1 February 2010
    Company Announcements Platform
    Australian Stock Exchange Limited
    Exchange Centre
    20 Bond Street
    SYDNEY NSW 2000
    Via ASX Online

    KENNEDY #1H - OPERATIONS UPDATE

    Adelphi Energy Limited (?Adelphi?) is pleased to provide the following update on operations at the Kennedy #1H well.
    Adelphi has been advised by the Operator, Texas Crude Energy Inc (?TCEI?), that the isolation plugs set as part of the fracture stimulation operations have been drilled out and the well commenced unloading at 0100 hrs on Thursday, 28 January 2010 (USCST).

    The initial production rate going to sales at 0700 hrs on Saturday 30, January (USCST) using a 22/64 choke was 4.39 mmscf/d gas and 1,132 bpd of condensate. The water production rate, from the recovery of frac fluids, was 408 bwpd.

    Whilst these initial rates are very encouraging, the following points should be noted:-

    ? This is an initial production rate during clean up and is not yet indicative of a short or long term production profile.

    ? The well still has considerable fluids to recover from the fracture stimulation operations.

    ? The well is flowing from approximately 2,200 ft of stimulated Eagle Ford Shale with the remainder of the 4,000 ft horizontal liner isolated and not contributing.

    ? The well is currently producing through the 7" production casing, with a production tubing string to be installed in due course.

    Adelphi?s Managing Director, Chris Hodge commented:

    ?Whilst it is early days, these initial flow rates are extremely encouraging including the expected high condensate ratio. We look forward to seeing how the well cleans up as well as the imminent fracture stimulation of our Weston well. Together with the three new wells being drilled as part of the farm-in program by Hilcorp across the Sugarloaf AMI, we expect to obtain additional valuable production performance data in the very near term to further
    prove up the commercial potential of our interests."



    ok......

    my data tells me this is the production recorded for kennedy for the two days from 0700 hours the 30th Jan 2010 to 31st Jan 2010. which is remarkable imho, indeed staggering..

    jan 2010 production totals as given to the texas rrc

    20,696 mcf
    3,747 bo


    all imho and dyor
 
watchlist Created with Sketch. Add ADI (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.