My updated resource estimate as at BR-17-18.
Strike = ~400m strike
Width = ~50m (but up 150m at widest point)
Depth = ~60m
Density = 3.75t/m^3 (I use the regression formula for Veovaca resource and geometric mean of all mineralized intervals > 1.5% Pb+Zn)
400m strike * 50m width * 60m depth * 3.75t/m^3 = 4.5Mt
Below are sections using 15m painted log intervals (30m area of influence). In my observation, resource models for deposits showing strong continuity of grade-thickness infer from a 50m area of influence.
Plan view from overhead:
Long section looking West:
Cross section looking North: