ARQ 0.00% 8.7¢ arq group limited

update, page-30

  1. 6,650 Posts.
    Hi BG

    I hope you are wrong, with regard to the flow rate calculations. I assume it just sloppy reporting by ARQ.

    Cheers

    PC43

    PS If there is oil then the one or two week delay before re-opening the taps should the entire reservoir to reach more equilibrium position. In simple terms if there is oil it should have floated to the top.
 
watchlist Created with Sketch. Add ARQ (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.