    I went to Contact Energy website to find some more inf, and found this info in their A/Reports.

    YOU CAN SEE THAT THE CONTACT ENERGY UGS LOOKS TO BE MUCH SMALLER THAN THE MOS PROJECT - C/E APPEARS TO HAVE 10-15PJ OF WORKING GAS - WHEREAS MOS WILL HAVE 75PJ !

    Contact Energy 2009 A/R:
    Flexible low-cost legacy Maui gas supply arrangements have now expired (although Contact still retains
    further ongoing rights to other Maui gas). Current gas supply contracts have relatively flat and fixed daily
    take requirements, which constrain the ability of gas-fired power stations to adjust their output in response
    to fluctuating hydro inflows. During the second half of this financial year the impact of inflexible and high
    priced gas began to impact the operation of Contact’s portfolio with the gas-fired plant operating at times
    when prices were insufficient to cover the variable costs of operation.

    Contact has implemented a series of strategies to help to mitigate the impact of transmission system
    constraints and gas supply inflexibility. These include:
    • In 2008, Contact acquired the rights to the largely depleted Ahuroa gas reservoir to convert the field into an
    underground gas storage facility. Contact commenced injecting gas into the Ahuroa field in December 2008
    and a total of 5.6 petajoules (PJ) (excluding LPG) is now held in the reservoir. Although the gas storage
    project is not expected to be fully operational until 2010, the storage facility has already provided Contact
    with a valuable source of fuel flexibility by providing an ability to inject and store ‘must-take’ gas during the
    low demand and high hydro inflow summer months. With the addition of a more powerful compressor
    during September 2009 the daily volume capable of being injected will increase.

    While the construction of the Ahuroa gas storage and Stratford peaker projects are on schedule for completion in
    mid 2010, Contact will have limited ability to manage gas inflexibility during the current financial year (although
    Contact is continuing to inject gas into Ahuroa to build up the cushion gas). Ahuroa gas storage, together with the
    Stratford gas-fired peakers, will make a material difference to Contact’s ability to manage and leverage wholesale
    price volatility.

    Extract from Contact Energy 2008 A/R
 