BSM 0.00% 0.8¢ bass metals ltd

Twitter progress, page-385

  1. 235 Posts.
    lightbulb Created with Sketch. 5
    Only briefly to the phantom discussion. Level 1 should only run for months. The new Stage 2 system has a completely different scale, different parameters + challenges and will be completely retuned + retracted. Phase 1 is only for the base test of the mine + Mill. Nothing needs to be optimized. If they can economically show a theoretical red zero (even on heaps), that's enough! I also do not need big sales and a quarterly profit of $ 50,000. I want to see that they sell something. It is important to me that the promised product quality is basically correct.



    berlinerbaer
 
watchlist Created with Sketch. Add BSM (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.