Listen to Proactive Investors 21/11/18 at 1min 25sec, the plant should be completed by the end of the 1st quarter 2019.
As for the timeline graph, I would think they would be tinkering with this plant for sometime. If you have worked in a plant startup it can take some time to work out the bugs. See the Ann 4/2/19... already mentions possible replacement of pre-treatment section depending on results. Remember this is a new concept.
It is much better and cheaper to use the pilot plant for a number of different possibilities before a production plant is built.
ASN Price at posting:
7.8¢ Sentiment: Hold Disclosure: Held