CAN 6.25% 4.5¢ cann group limited

Tullamarine Project Constructrion

  1. 43 Posts.
    lightbulb Created with Sketch. 17
    With construction of stage 3 about to begin I did a bit of an investigation and found the site. Below is the site in relation to the Airport and second is a satellite image of the site from Feb 24. I'll try post regularly to this thread as newer images become available.

    https://hotcopper.com.au/data/attachments/1472/1472737-87d9a3989fad4ef9d3f2aed6c67ab34b.jpg
    https://hotcopper.com.au/data/attachments/1472/1472738-1ddb836e5e704440deb4789c7bf876c7.jpg

 
watchlist Created with Sketch. Add CAN (ASX) to my watchlist
(20min delay)
Last
4.5¢
Change
-0.003(6.25%)
Mkt cap ! $17.80M
Open High Low Value Volume
4.8¢ 4.8¢ 4.5¢ $21.48K 469.8K

Buyers (Bids)

No. Vol. Price($)
3 342919 4.5¢
 

Sellers (Offers)

Price($) Vol. No.
4.6¢ 24419 1
View Market Depth
Last trade - 16.10pm 15/11/2024 (20 minute delay) ?
CAN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.