still trying to buy cheap shares Ceh.....
yet another not holding looking to down ramp
please feel free to put up your calcs as I am human and if I’ve made a mistake happy to be corrected. The way I see it is
7000 tonnes of ore mined ( jan presentation)
@ 15% grade = 1050 tonnes of Zn
@ $3900 AU / tonne = $4,050,000 revenue
less C3 costs at .61 cents /lb US =$1900 / tonne AU
or circa AU $ 1.95 million in costs leaves around $2+ million in change.
GLTAH
Cheers Rb
- Forums
- ASX - By Stock
- trading today
still trying to buy cheap shares Ceh.....yet another not holding...
-
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CZL (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Andy Udell, CCO
Andy Udell
CCO
SPONSORED BY The Market Online