From the video: Look we have some testing to do ...
Meaning:
A number of detailed background studies that will need to be undertaken to better inform the development of these sites for industrial purposes. The additional background studies include:
Infrastructure studies (water, sewerage, roads, power, telecommunications, rail, gas);
Environmental studies (water cycle management, soil / geotechnical studies);
Flood study;
Noise and amenity impact study; Scenic amenity study;
Transport and traffic network.
The background studies will help inform a detailed structure plan that will encompass the entire industrial site. The detailed structure plan will take the form of a precinct plan providing clear guidance as to how the future industrial area will develop in a sequential and efficient manner.
*Any future infrastructure upgrades to enable the servicing of the proposed industrial site at Woodstock are presently not included within the next 15 year planning horizon of the Local Government Infrastructure Plan (LGIP). As such, there will be a need for significant investment in order to bring forward this development in relation to the upfront costs of infrastructure to service the site.
* I guess this now will need to be fast tracked, but it is still worth an estimated $100 million the state government has to find!
- Forums
- ASX - By Stock
- MNS
- Townsville battery plant moving forward after council meetings
Townsville battery plant moving forward after council meetings, page-17
-
- There are more pages in this discussion • 22 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add MNS (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $50.37M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
MNS (ASX) Chart |
Day chart unavailable